HIVE DIGITAL TARGETS 35 EH/S IN 2026
Today @HIVEDigitalTech announced a definitive agreement to expand its hydroelectric-powered data center campus in Yguazú, Paraguay, adding 100 MW and bringing the site’s total renewable capacity to 400 MW.
Powered by the Itaipú Dam, this Phase 3 expansion is expected to elevate HIVE’s global Bitcoin mining capacity to 35 EH/s by 2026, solidifying its position as a leader in sustainable digital infrastructure.
Concurrently, through a strategic partnership with @Bell, $HIVE aims to increase its #HPC and #AI operations fivefold, integrating $BUZZ #HPC’s sovereign AI cloud infrastructure with @Bell national network, enabling secure, renewable-powered AI and blockchain computing across Canada and beyond.

5.89萬
283
本頁面內容由第三方提供。除非另有說明,OKX 不是所引用文章的作者,也不對此類材料主張任何版權。該內容僅供參考,並不代表 OKX 觀點,不作為任何形式的認可,也不應被視為投資建議或購買或出售數字資產的招攬。在使用生成式人工智能提供摘要或其他信息的情況下,此類人工智能生成的內容可能不準確或不一致。請閱讀鏈接文章,瞭解更多詳情和信息。OKX 不對第三方網站上的內容負責。包含穩定幣、NFTs 等在內的數字資產涉及較高程度的風險,其價值可能會產生較大波動。請根據自身財務狀況,仔細考慮交易或持有數字資產是否適合您。